TWU’s campus campanile was cleaned this week and some great photos of the inside of  bell tower were taken.  Later this summer additional work will be carried out to inspect the individual bells and replace the bird barrier inside the belfy.

Pressure washing from a lift truck

Looking down into the center of the campanile

Two of the bells from inside the campanile

Looking down from inside the bell chamber

The clapper inside the bell is triggered electronically.